Side-by-side

GE 360 Foam Wash vs Integrated Components Solutions (ICS)

Spec comparison for two products on Aviation Souk. Both compete in Aircraft MRO / Line Maintenance.

Cost of ownershipGE 360 Foam WashIntegrated Components Solutions (ICS)
Price tier
Lead time (weeks)?–??–?
Delivery
Install
GCC airports deployed00
Certifications00
Specs

Technical specifications.

SpecGE 360 Foam WashIntegrated Components Solutions (ICS)
Active cleaning time3–4 hours (narrowbody) hrs
Preparation and restoration~1–2 hours hrs
Drying window24 hours before return to service hrs
Personnel required2
Recommended interval (active programme)Every 250–500 cycles
EGT/fuel-flow recovery vs water washUp to 3×
Approved engine familiesGE90, GEnx, CF34, CF6, GP7200; LEAP-1A/B service evaluation complete
Total washes performed (to 2026)6,500+
GE90 annual fuel saving potentialUp to 35,500 gallons / ~380 tonnes CO2 per aircraft
GEnx annual fuel saving potentialUp to 15,900 gallons / ~70 tonnes CO2 per aircraft
Operational environmentIndoor hangar or outdoor; no dedicated drainage required
Programme origin2011 (Virgin Australia / SR Technics agreement)
Aircraft types coveredAirbus (A320, A330, A350, A380), Boeing (737NG, 787, 777), Embraer E-Jet family
Component categoriesRotables and repairables (airframe and engine-related)
Portfolio asset base1.2 USD billion (group)
Owner/guarantorMubadala Investment Company PJSC
Decide

Ask Aviation Souk to pick for your tender.

The AI weighs both products against your specific brief — airport, certifications, lead time, budget — and tells you which fits.

Ask the AI →