Side-by-side

Passenger Boarding Bridge — Tunnel Steel vs A380 Upper Deck Bridge

Spec comparison for two products on Aviation Souk. Both compete in Jet Bridges / Passenger Boarding Bridges.

Cost of ownershipPassenger Boarding Bridge — Tunnel SteelA380 Upper Deck Bridge
Price tier
Lead time (weeks)?–??–?
Delivery
Install
GCC airports deployed00
Certifications00
Specs

Technical specifications.

SpecPassenger Boarding Bridge — Tunnel SteelA380 Upper Deck Bridge
Drive systemElectro-mechanical
Tunnel constructionSteel-panel walls
Auto-level systemDual-sensor, dual-circuitry redundancy
Anti-collisionBridge-to-bridge and bridge-to-aircraft protection
Aircraft sealingFront closure system, weather-excluding
Quality standardsISO 9001, ISO 14001, OHSAS 18001, CE, TKDN
Optional equipmentVisual docking guidance, 400 Hz GPU, pre-conditioned air, potable water
ConfigurationTwo-tunnel and three-tunnel options
Upper deck door height>7 m above apron
Bogie systemOptional Dual Drive Bogie — two independently powered drive axles
Safety floorStandard (spring-loaded fuselage contact protection)
Structural designRigid extended MTB frame for upper-deck elevation
Docking guidanceAPIS/A-VDGS integration recommended for semi-automatic approach
Aircraft servedAirbus A380 upper deck (Door 1 upper level)
Decide

Ask Aviation Souk to pick for your tender.

The AI weighs both products against your specific brief — airport, certifications, lead time, budget — and tells you which fits.

Ask the AI →