Side-by-side
Scout X High-Performance Imaging Platform vs HVM Planters
Spec comparison for two products on Aviation Souk. Both compete in perimeter-security.
| Cost of ownership | Scout X High-Performance Imaging Platform | HVM Planters |
|---|---|---|
| Price tier | — | — |
| Lead time (weeks) | ?–? | ?–? |
| Delivery | — | — |
| Install | — | — |
| GCC airports deployed | 0 | 0 |
| Certifications | 2 | 0 |
Specs
Technical specifications.
| Spec | Scout X High-Performance Imaging Platform | HVM Planters |
|---|---|---|
| Camera | Nikon Z9 (core release); operates with any lens the Z9 supports | — |
| Still resolution | 45 MP | — |
| Video | 4K | — |
| Remote control | Remote control of Z9 capture functions - Start / Stop / Recording | — |
| Virtual PTZ | Zoom factor comparable to 300x versus the Flexnet preview (with Z9) | — |
| Detection | On-board image processing detects motion in user-defined areas; single or multiple images before, during and after an event | — |
| Activation | By other sensors over the radio network or by a PIR module attached via cable; operator pre-set motion-control sequence | — |
| Transmission | Full-resolution imagery stored locally, compressed previews sent to base station; advanced compression for low-bandwidth mesh | — |
| External camera support | Any 3G-SDI camera up to 1080p60; USB/UART-controllable USB or SDI cameras (on-demand adaptations) | — |
| On-board storage | Several thousand images and videos | — |
| Dimensions (excl. Z9) | 190 x 90 x 60 mm | — |
| Weight (excl. Z9) | 1.3 kg | — |
| Battery life | 20 days integrated rechargeable (standard of 1 wake-up of 30 s/hour); external battery for 30+ days | — |
| Encryption | AES-256 | — |
| Operating temperature | -32 to +71 degC | — |
| Environmental standard | MIL-STD-810 | — |
| EMC standard | MIL-STD-461 | — |
| — | undefined | |
| — | undefined | |
| — | undefined | |
| — | undefined | |
| — | undefined | |
| — | undefined |
Decide
Ask Aviation Souk to pick for your tender.
The AI weighs both products against your specific brief — airport, certifications, lead time, budget — and tells you which fits.
Ask the AI →
