Side-by-side

LED Airport Rotating Beacon (L-801A(L) Medium Intensity / L-802A(L) High Intensity) vs Constant Current Regulator (CCR) & Airfield Lighting Control & Monitoring System / ALCMS (distributed/integrated by Vardhman Airport Solutions)

Spec comparison for two products on Aviation Souk. Both compete in Runway Lighting & Airfield Electrical.

Cost of ownershipLED Airport Rotating Beacon (L-801A(L) Medium Intensity / L-802A(L) High Intensity)Constant Current Regulator (CCR) & Airfield Lighting Control & Monitoring System / ALCMS (distributed/integrated by Vardhman Airport Solutions)
Price tier
Lead time (weeks)?–??–?
Delivery
Install
GCC airports deployed00
Certifications00
Specs

Technical specifications.

SpecLED Airport Rotating Beacon (L-801A(L) Medium Intensity / L-802A(L) High Intensity)Constant Current Regulator (CCR) & Airfield Lighting Control & Monitoring System / ALCMS (distributed/integrated by Vardhman Airport Solutions)
FAA Certification (L-801A)ETL Certified Medium Intensity per AC 150/5345-12F
FAA Certification (L-802A)ETL Certified High Intensity per AC 150/5345-12F
Standard ComplianceICAO Annex 14 Vol. 1, Eighth Edition
Effective Candelas — L-801A50,000 minimum (+3° to +7°) cd
Effective Candelas — L-802A75,000 minimum (+3° to +7°) cd
Rotation Speed12 RPM (24 flashes/min)
LED Lamp Life50,000 typical (~12 years) hours
Power — L-801A Class I / II136 W / 536 W
Power — L-802A Class I / II195 W / 595 W
Operating Temperature (Class I)−30 °C to +55 °C
Operating Temperature (Class II)−55 °C to +55 °C
Wind Rating100 mph
Weight (L-801A)75 lb
Weight (L-802A)77 lb
Drive SystemPatented belt-drive, permanently lubricated
Output ratings (380–415 V)2.5 to 30 kVA
Output ratings (210–240 V)2.5 to 15 kVA
Output currents available6.0, 6.6, 12, 20 A
Input voltage (single-phase)220–240 V
Input voltage (two-phase)380–440 V
Input frequency50 Hz
Power factor (≤10 kVA)≥0.90
Power factor (≥12 kVA)≥0.95
Efficiency≥90 %
Controller16-bit DSP
CommunicationRS-485
CoolingAir-cooled, fan-free
CCR complianceICAO ADM 9157 Part 5 para 3.2, FAA AC 150/5345-10H, IS 12291-1987
ALCMS complianceICAO Annex 14, ADM Part 5 para 3.4 & 3.7, FAA AC 150/5345-56B, IEC 61508
Decide

Ask Aviation Souk to pick for your tender.

The AI weighs both products against your specific brief — airport, certifications, lead time, budget — and tells you which fits.

Ask the AI →