EAKIT Standard Toolkit
ElectroAir logo
Supplier
ElectroAir
Ground Support Equipment (GSE)

EAKIT Standard Toolkit

Dedicated GSE toolkit of special tools and measuring instruments for commissioning, periodic maintenance, and repair of ElectroAir ground power units and pit systems.

Specs verified against manufacturer documentation
Pricing
Request a quote for current pricing, lead time and delivery to your airport.

The EAKIT standard toolkit is the purpose-assembled collection of specialised tools and measuring instruments that ElectroAir specifies for the commissioning, routine maintenance, and repair of its GPU, pit system, and aircraft power supply product range. A dedicated toolkit of this type addresses a recurring problem in GSE maintenance: field technicians arriving at a GPU for first-line servicing or a scheduled check often lack the exact instruments needed for that equipment's specific test procedures — particularly for 400 Hz power quality measurements, which require instruments calibrated and rated for aviation frequencies rather than standard 50/60 Hz utility instruments. The EAKIT ensures that the technician has the correct tool for each task, reducing service time, avoiding measurement errors caused by out-of-specification instruments, and maintaining personnel safety when working with high-current aircraft power circuits. It is designed as a complement to the technical documentation package (user manual, maintenance manual, spare parts catalogue, and equipment passport) that ships with each ElectroAir GPU. For procurement teams building a support infrastructure package around a GPU acquisition, the EAKIT is the appropriate supporting item to specify alongside initial spares, documentation, and training.

From the manufacturer’s documentation

Technical specifications.

ContentsSpecial tools and measuring devices for GSE commissioning, maintenance, and repair
CompatibilityElectroAir GPU, PIT system, and aircraft power supply equipment
PurposeCommissioning, periodic maintenance, and repair procedures
Best for

Use cases.

  • Initial commissioning of ElectroAir GPU and pit system installations
  • Scheduled periodic maintenance of 400 Hz and 28.5 VDC ground power units
  • First-line field repair of GPU and pit system faults by MRO technicians
  • Training programmes for new GPU maintenance technicians
  • Support package procurement alongside a new GPU fleet acquisition