Supplier
HOK
Hamad International Airport Masterplan Contributions (Doha)
Qatar hub masterplanning and terminal design inputs.
HOK contributed to long-range masterplanning and terminal concept work at Hamad International Airport Doha. The airport originally opened in 2014 at 30 mppa and is now being expanded to 65+ mppa under a Phase C programme (targeting 70 mppa by 2030).
Hamad International Airport Masterplan Contributions (Doha)
terminal · design · architecture
AVS·CAT
Product at a glance
- Category
- terminal design architecture
- Launched
- 2014
- Price tier
- enterprise
- GCC sites
- 1
- Status
- ● Current model
Technical specifications
Key specs
| Original capacity | 30 mppa (2014) |
| Phase C target | 70 mppa by 2030 |
| Current terminal GFA | 600,000+ sqm |
| Design approach | Long-linear concourse, biophilic central garden (Phase B addition) |
Compatibility
Works with
- Coordinates with Arup and Dar engineering teams
- Interfaces with Qatar Airways hub operations
Certifications
Approvals
LEED (portions)
Best for
Typical use cases
Use case 1
Master-planning inputs for hub terminal expansion.
Alternatives in the same category
Compare against
Foster + Partners
Queen Alia International Airport Terminal (Amman)
Shaded modular tessellated-roof terminal for Amman.
Foster + Partners
Masdar City Masterplan (Abu Dhabi)
Low-carbon aerotropolis-adjacent masterplan next to AUH.
Skidmore, Owings & Merrill (SOM)
Haj Terminal, King Abdulaziz International Airport (Jeddah)
Aga Khan Award-winning tensile fabric Hajj terminal.
