Netherlands Airport Consultants (NACO) logo
Supplier
Netherlands Airport Consultants (NACO)

Dubai World Central (DWC) Phased Masterplan Advisory

Advisory support for the 260 mppa DWC expansion roadmap.

NACO provided masterplanning and phased-capacity advisory inputs to Dubai Aviation Engineering Projects (DAEP) on the Al Maktoum/DWC long-range roadmap, which in April 2024 was confirmed to expand toward 260 mppa with five parallel runways and concourse grids larger than any existing airport. NACO's contributions focus on airside geometry, phased terminal nodes, and passenger processing throughput envelopes.

Netherlands Airport Consultants (NACO) logo
Dubai World Central (DWC) Phased Masterplan Advisory
terminal · design · architecture
AVS·CAT
Product at a glance
Category
terminal design architecture
Launched
2024
Price tier
premium
GCC sites
1
Status
● Current model
Technical specifications

Key specs

Target capacity260 mppa
Runways (planned)5
Programme confirmedApril 2024
Phase 1 target150 mppa first decade
Design approachLinear concourse grid, modular expansion
Compatibility

Works with

  • Coordinates with Dubai Airports, DAEP and Emirates
  • Inputs feed architect-of-record (to be appointed) and engineers
Certifications

Approvals

ICAO advisor recognition
Best for

Typical use cases

Use case 1
Megahub phased-capacity planning.
Installed in GCC

Proven at these airports