Dabico A-Bridge LLC (ex-AmeriBridge) logo
Supplier
Dabico A-Bridge LLC (ex-AmeriBridge)

Dabico A-Bridge PBB Refurbishment Program

Full-envelope refurb extending PBB life 15-20 years.

The Dabico A-Bridge PBB Refurbishment Program is a 30+ year North American playbook now bundled globally through Dabico Airport Solutions. A full refurb strips the bridge to its primary structure; renews floor, canopy (typically a new HÜBNER unit), bumpers, and wall panels; replaces the control PLC and HMI; recalibrates drive wheels and bogies; and re-commissions against modern AC 150/5220-21 / EN 12312-4 compliance. Extends useful life a further 15–20 years at roughly 40% of new-build capex. GCC delivery uses Dabico's regional office alongside FMT Sweden new-build offers, giving a single-vendor lifecycle solution.

Dabico A-Bridge LLC (ex-AmeriBridge) logo
Dabico A-Bridge PBB Refurbishment Program
jet · bridges · pbb
AVS·CAT
Product at a glance
Category
jet bridges pbb
Launched
1993
Price tier
premium
GCC sites
0
Status
● Current model
Technical specifications

Key specs

Life extension15 – 20 years
Cost vs new-build≈ 40 % of new capex
ScopeFloor, canopy, bumpers, walls, PLC, HMI, drive
Compliance resetAC 150/5220-21, EN 12312-4 current
Typical duration per bridge4 – 8 weeks
Service modelOn-site at airport, staged outages
Canopy replacementUsually HÜBNER OEM
Warranty2 years post-refurb standard
Compatibility

Works with

  • All major PBB OEMs (JBT, TKE, ADELTE, CIMC, FMT, ShinMaywa, MHI, Rotem, Bukaka)
  • Integrates new PLC with airport AODB feed
  • Bundled with FMT Sweden new-build tenders via Dabico
  • Suitable for 30+ year old heritage bridges
Certifications

Approvals

ISO 9001
OSHA 10
FAA AC 150/5220-21
EN 12312-4
Best for

Typical use cases

Use case 1
GCC hub with 1990s PBB fleet needing 15-year extension.
Use case 2
Retrofit avoiding 4-month new-build lead time.
Use case 3
Bridge relocation between concourses during expansion.