Joramco logo
Supplier
Joramco

737NG/MAX D-Check at Joramco (AMM)

Boeing 737NG and MAX D-check in a Part-145 Airbus-and-Boeing cross-rated hangar.

12-year D-check for 737NG and 737 MAX covering heavy structural inspection, corrosion prevention and control programme (CPCP), landing-gear overhaul event alignment, cabin reconfig and repaint. Joramco is type-rated on 737 Classic / NG / MAX and is one of the few MROs in the region running both Airbus A320 family and 737 families on parallel lines.

Joramco logo
737NG/MAX D-Check at Joramco (AMM)
aircraft · mro · line · maintenance
AVS·CAT
Product at a glance
Category
aircraft mro line maintenance
Price tier
mid
GCC sites
1
Status
● Current model
Technical specifications

Key specs

Aircraft types737-700 / -800 / -900ER / MAX 8 / MAX 9
Typical turnaround30 – 45 days
IncludesCPCP, landing-gear change option, paint
Hangar baysShared with Airbus A320 family lines
Compatibility

Works with

  • 737-700/-800/-900ER
  • 737 MAX 8 / MAX 9
Certifications

Approvals

JCARC CAR-145
EASA Part-145
FAA 145
GCAA CAR-145
Best for

Typical use cases

Use case 1
flydubai 737 MAX heavy check.
Use case 2
Lessor redelivery check for end-of-lease 737NG.
Installed in GCC

Proven at these airports